I lost my camera for a while and just found it. The April work is now documented on the blog:
Rhapsody recore blog - April post Good news - Rhapsody was launched on Friday 1 May and I sailed from Fall River to Newport today 3 May (in the rain). Still lots of topside cleanup work to be done. I'll post more pictures on the blog once the weather clears up.
Here's a picture of the transom exterior before gelcoat was sprayed.
![[Linked Image from 4.bp.blogspot.com]](http://4.bp.blogspot.com/_ftj-C0DWhRg/Sf42jWkCFoI/AAAAAAAAAJM/pfnNu75CDDE/s320/74-transom-masked-for-gelcoat.jpg)