This exposed area was original. This is as far as we ground down
Voids are observed along core/spine joints from original build.
I am sure repair is stronger than original but I have no plan to test it.
We also ground and relaid in the shallow keel sump area aft of the drop.
I was just questioning the idea of removing the vermiculite from outside. The presence of the spine


Don King