Joao,
Here are photos of my setup.

Attachments
y valve close up.JPG (112.53 KB, 64 downloads)
Close up of Y valve. Handle removed, set to fill holding tank
holding tank aft end.JPG (107.14 KB, 59 downloads)
holding tank aft end
holding tank drain hose.JPG (92.87 KB, 54 downloads)
Holding tank drain hose
vented loop in anchor line locker.JPG (93.45 KB, 47 downloads)
Vented loop in anchor line locker