Originally posted by D. Bartley:
Dave can probably describe it better I'm sure...
It looks like they attach a D ring to the primary winch using a sail tie. To that ring they attach a turning block. Run the sheet through the turning block, then up to the secondary on the opposite side.
Dunno what they do for spinnaker winches when they get to the top mark... use the halyard winch temporarily?
Dennis,
We hoist and cleat the Spinnaker at the mast.